Dentistry Clinic and Facilities Renewal Weekly Look Ahead (August 12th)

Posted by Admin on August 12, 2016 in Dentistry Renewal, News

PHASE 1

Level 1 MDR

-          Schedule was moved ahead one week by Dentistry’s request. Handover was today

-          Training and walk-thrus with staff will be next week

PHASE 2

Lvl 1 PH 2.1 & 2.2 North Clinic

-          Northeast Mechanical and Electrical ceiling rough-ins are ongoing

-          Steel stud is ongoing

Lvl 2 PH 2.2 North Clinic

-          Mechanical and Electrical ceiling rough-ins are ongoing

-          Scanning for cores is ongoing. Core drilling is ongoing

-          Steel stud is ongoing

-          Door frames are being stood

-          IC walls and ante room for new layout will be installed next week

Penthouse

-          Rough-ins are ongoing for the new heating and medical gas services

Lvl 1 PH 2.4 Corridor

-          Corridor schedule was moved ahead one week with MDR. Handover was today

-          Walk-thrus with staff will be next week

Lvl 2 PH 2.4 Corridor

-          M&E rough-ins are complete

-          Ceiling tile is ongoing

-          Wall patching is complete

-          Painting will be next week

Shutdowns Next Week

1.       A heating shutdown may be required next weekend. Details to be advised